by Creativefive | Aug 29, 2025
The Project The client required Building Surveyor, Quantity Surveyor, Principal Designer and Project Management services to provide a building that would suit the high dependency needs of its occupants. A training kitchen, passenger lift, laundry room and gym were...
by Creativefive | Apr 21, 2022
The Project Upgraded security systems including new intruder alarm, access control and CCTV Overlaying of life expired roof covering, including framing out over redundant northlights Refurbishment of heavily worn corridors and WC’s Works to address a number of issues...
by Creativefive | Apr 21, 2022
The Challenge Against an extremely tight project deadline the existing warehouse had a significant schedule of works to be undertaken including the following items: Stripping of redundant M&E,Significant programme of asbestos removalRemoval of all existing racking...
by Creativefive | Apr 21, 2022
The Challenge The brief for this project centred around the Trust’s need to accommodate the highest number of staff within the existing building with minimal intervention to the building fabric. In addition to this, throughout the duration of the works, a number of...
by Creativefive | Apr 21, 2022
The Project Make were approached to undertake a full refurbishment of the Reception area at NFU Mutual’s Regional Service Call Centre which included several physical security measures. Through the process of leading design workshops with the Client, three design...