by Creativefive | Oct 21, 2021
Make Consulting worked with a Mechanical and Electrical Consultant to produce a full condition report for the Client, detailing the condition of each element on each elevation of the property and the works that would be required to fix these. The Client then used this...
by Creativefive | Oct 21, 2021
With the Condition Improvement Funding secured via Make Consulting (Make), the Team at Make created the technical specification along with other tender documents and a proposed programme for the works. The project involved stripping off the existing slate tiles and...
by Creativefive | Oct 21, 2021
A new layout design for each office was developed with NFU Mutual before full design and tender documents were produced. The existing shop front was looking tired and unwelcoming, therefore the design of a new façade was incorporated to provide a more sophisticated...
by Creativefive | Oct 21, 2021
After a successful funding decision Make specified the works which included the renewal and upgrade of the defective electrical wiring and fittings in the building to provide safe, hazard free and compliant electrical components. Defective wiring to the fire alarm...
by Creativefive | Oct 21, 2021
In 2017 Make secured £455,000 for the replacement of roof coverings which had multiple leak points throughout; moisture was coming in to direct contact with the plywood roof deck, weakening it’s structural integrity and causing internal water ingress to access...