by Creativefive | Oct 21, 2021
Make liaised with the landlord of the building to ensure that consent had been granted prior to works taking place. The Client was interested in installing a coffee shop and dining facilities within the building but was unsure how to maximise the space for their...
by Creativefive | Oct 21, 2021
Make created outline design proposals and produced full design tender documentation before issuing this along with associated supporting documentation provided by NFU Mutual. Make managed all Client and Contractor queries efficiently to ensure works were completed on...
by Creativefive | Oct 21, 2021
Initially, a site visit was arranged to identify the required works needed along with the current condition information for each property in question. A condition report was then produced and Make liaised with the Client and landlord to create a proposed schedule of...
by Creativefive | Oct 21, 2021
In 2016 Make secured £500,000 for the Academy to undertake recovering of the existing roof due to multiple leak points causing internal water ingress and damage to teaching spaces. Initially, only Phase One of the Project was successful. Not being satisfied with...
by Creativefive | Oct 21, 2021
Make conducted a roofing survey and collected the required evidence to prepare and submit a Condition Improvement Fund (CIF) bid on behalf of the school. The bid was successful and the School was awarded funds to transform their roofs across the School estate....