by Creativefive | Apr 21, 2022
In 2018 Make secured £90,000.00 for the resurfacing of the playground surfacing at St Andrews C of E. The existing surface had started to degrade, with evidence of breaking up of the surface, vegetation growth and uneven surfaces. Thus, the existing surface was not...
by Creativefive | Apr 21, 2022
The Challenge One example where NCH engaged with Make for additional support is on their decoration schemes. Historically, the scheme had been managed on a case by case basis, with works required to each street or property being agreed verbally on site between the...
by Creativefive | Apr 21, 2022
Due to Make Consulting’s past experience in working with a large number of Local Authorities and Housing Associations over many years in the capacity of new build and refurbishment Project Manager/Principal Designer, Kettering Borough Council appointed Make Consulting...
by Creativefive | Oct 21, 2021
Health and safety was a key factor in this project as the building was to remain open and fully functional during the works. A risk assessment was produced and consulted to enable more disruptive works to be sequenced and completed out of hours. Due to the sheer size...
by Creativefive | Oct 21, 2021
Make provided NFU Mutual with a fully supportive service, from inception to completion. This included conducting meetings with the agency to gain an insight into their requirements, producing outline design, construction and tender documentation and managing the...