Make Consulting worked with a Mechanical and Electrical Consultant to produce a full condition report for the Client, detailing the condition of each element on each elevation of the property and the works that would be required to fix these. The Client then used this...
by Creativefive | Oct 21, 2021
A new layout design for each office was developed with NFU Mutual before full design and tender documents were produced. The existing shop front was looking tired and unwelcoming, therefore the design of a new façade was incorporated to provide a more sophisticated...
by Creativefive | Oct 21, 2021
Make completed a schedule of condition prior to NFU Mutual acquiring the property, identifying arising issues and works required before preparing an initial proposed layout. Due to the shape of the building, careful consideration had to be made to ensure all offices...