Make Consulting have been working with Nottingham City Homes (NCH), fulfilling a number of roles on their behalf, primarily building surveyor, principal designer, lead designer and quanitity surveyor. As an organisation, NCH did not have the capacity to undertake a number of di erent surveys, and approached Make for interim support.

The Challenge

One example where NCH engaged with Make for additional support is on their decoration schemes. Historically, the scheme had been managed on a case by case basis, with works required to each street or property being agreed verbally on site between the surveying and decoration scheme. NCH appointed Make to review their survey methodology and devise a method to integrate decoration and repairs which had historically been carried out as two separate entities.

The Solution

Through regular communication and their approachable nature, the surveyors at Make were able to work seamlessly alongside the NCH team. Make developed a survey format which allowed for the integration of decoration and repairs and worked in conjunction with the Client provided schedule of rates so orders could be raised. In addition, photographic schedules were provided, alongside any plans as required to ensure clarity to the team on the repair / decoration works. By scheduling out the works, Make provided NCH with visibility of expenditure across the year, allowing any potential overspend to be managed early in the process. Due to the success of this project, Make have provided on the job training to new NCH staff who will now be taking on the role, ensuring smooth transition back to the Client.

Project Specifics

Our Role

Building Consultancy Support, Building Surveying

Dates

2020 - Ongoing

Duration

Ongoing